This overpass structure was built over the railway tracks as part of the Bellheim bypass. HEBERGER carried out the complete construction of the three-span slab girder bridge with a total span of 54 metres, from the deep foundations with large bored piles to the bridge railings and contact protection.
The superstructure of longitudinally prestressed precast girders with in-situ concrete additions rests on rectangular box abutments with parallel wing walls and is supported by two rows of piers, each with three individual piers on a concrete beam.