Bellheim construction of bypass

L 509

Bellheim bypass

This overpass structure was built over the railway tracks as part of the Bellheim bypass. HEBERGER carried out the complete construction of the three-span slab girder bridge with a total span of 54 metres, from the deep foundations with large bored piles to the bridge railings and contact protection.
The superstructure of longitudinally prestressed precast girders with in-situ concrete additions rests on rectangular box abutments with parallel wing walls and is supported by two rows of piers, each with three individual piers on a concrete beam.

CONSTRUCTION TIME
19 months

Kommen Sie mit uns ins Gespräch!

HEBERGER Deutschland

Tel: +49 62 35 930-0
info@heberger.com

HEBERGER Tschechien

Tel: +42 02 44 00 0111
info@heberger.cz

HEBERGER Rumänien

Tel: +40 31 40 59 761
info@heberger.ro

HEBERGER Spanien

Tel: +34 97 11 60 761
es@heberger.com

HEBERGER Portugal

Tel: +35 12 52 41 18 29
portuguesa@heberger.com